Halfway Through the Holiday: Four Prep Sheets Before Work Resumes
Time of issue:
2026-10-07 12:43
Origin:
【Summary description】
October 5: the holiday is half over. A notice pops up in the team group chat: work officially resumes on October 8. Some people reply "Got it" and go back to sleep. Lao Zhou, the safety officer, does not. He takes out a blank sheet of paper, writes four lines on it, and first thing the next morning pins it to the whiteboard in the workshop: People, Machines, Hot Work, Equipment.
He tells the team leaders: "Restart doesn't begin at 8 a.m. on the 8th. It begins today. Go through these four prep sheets, one by one."
In their holiday safety reminders for the National Day and Mid-Autumn Festival period, emergency management authorities across China keep repeating the same assessment: equipment that sits idle for a long time is prone to faults or failure; once work resumes, temporary power hookups, hot work, inspection and maintenance, and desilting all pile up at once; and with managers away on leave, there is one less pair of eyes watching the site. The days before and after a restart have always been a peak window for accidents. Preparing in advance means pinning down the risks in that window before it opens.
Prep Sheet 1: People — Go Through the Roster First
On the list of people reporting on day one, the ones most likely to run into trouble are not the veterans. They are the "new faces": dispatched agency workers, temporary hires, staff on loan from other sites, and newly arrived interns.
GB 39800.1-2020 Specification for Equipping Personal Protective Equipment — Part 1: General Principles is blunt in clause 3.5: the employer shall provide and manage personal protective equipment for the dispatched workers and temporary personnel it uses, the interns it accepts, and any other outside personnel permitted to enter the work area. "Not one of our employees" does not mean "someone we don't need to fully equip." Clause 3.2 further requires that the equipment be appropriate to the working conditions, the hazard factors and the level of hazard, and suited to the person wearing it. Hand out a pair of safety goggles without a fit check, and the spatter will find the gap.
The law applies pressure from both ends. Article 45 of the Work Safety Law requires employers to provide personal protective equipment that meets national standards, and to supervise and educate workers to wear and use it according to the rules of use. Article 57 of the Work Safety Law requires workers to wear and use it correctly.
Prep action: Pull up the list of people reporting on day one and flag every new face. Write down the hazard factors for each corresponding post, assign equipment models to each individual, and have them try it on and sign. The schedule for the back-to-work refocus session and refresher training also goes on this sheet: decide now what the first post-holiday lesson will cover, and prepare it in advance.
Prep Sheet 2: Machines — Wake Up Equipment That Has Sat Idle for a Week
In a shut-down workshop, the equipment has sat quietly for seven days with the distribution cabinets switched off, air supplies shut, and materials cleared out. When the authorities warn that "equipment that sits idle for a long time is prone to faults or failure," this is exactly what they mean: lubricating oil settles, seals dry out and shrink, electrical components absorb moisture, and nobody remembers what state the emergency stops and interlocks were left in.
The rule during the holiday is clear: in principle, no start-ups, shutdowns, or inspection and maintenance are scheduled, and all special operations require escalated approval. So trial runs belong on the first day back, done according to procedure, not "just a quick switch-on" during the holiday.
Prep action: Create a "restart log" line for every critical piece of equipment: shutdown date, shutdown state, who is responsible for re-checking it, and trial-run time. Are the guards back in place? Does the emergency stop pop back up after being pressed? Do the safety interlocks still work? Confirm each item one by one before start-up. Follow your own site's equipment procedures for the specific steps; don't go by feel.
Prep Sheet 3: Hot Work — Think It Through Before You Issue the Permit
The period around a restart is when hot work is most concentrated: equipment needs overhauling, brackets need repair welding, and pipework needs modifying. Yet this is also when people are most fatigued and management is at its loosest.
GB 30871-2022 has a hard rule for this kind of work: clause 5.1.1 states that on public holidays, rest days, at night or in other special circumstances, hot work shall be subject to escalated management. That applies during the holiday, and the special period of the post-holiday restart should likewise be handled under the strictest interpretation.
Article 43 of the Work Safety Law requires that dedicated personnel be assigned to manage on-site safety for hazardous operations such as blasting, lifting, hot work and temporary electrical work. Item (3) of Article 101 of the Work Safety Law sets out the penalty: where no dedicated personnel are assigned to manage on-site safety, the employer shall be ordered to make corrections within a set time limit and fined up to RMB 100,000; if it fails to correct within that time, it shall be ordered to suspend production and business for rectification and fined between RMB 100,000 and RMB 200,000.
Prep action: Submit the hot work plan for the first week back now. Permits, fire watches, and clearing combustibles from the surrounding area: arrange each item in advance. Don't wait until the welder has been wheeled onto the site to remember the paperwork.
Prep Sheet 4: Equipment — What Has Sat in the PPE Cabinet All Season
The gear has spent the whole holiday in the cabinet, and it is due for a check-up. Clause 5.3.1 of GB 39800.1-2020 lists the conditions for scrapping and replacing equipment, including: failing inspection, exceeding its service life, and loss of function. A hard hat that has taken a knock, a lens that is scratched, a filter cartridge past its date: replace each one as you find it. No approval needed.
Prep action: Assign someone to open the PPE cabinet and go through the hard hats, safety goggles, face shields, gloves and safety footwear inside using four checks: check the date, inspect the condition, test the function, and match it to the task. Tomorrow's article covers the step-by-step check-up in detail.
The Three Most Common Pitfalls
Pitfall 1: Treating the restart as "something for the 8th." The roster, the trial runs and the hot work plan all need to be submitted in advance. Make them up on the day and something will be missed.
Pitfall 2: Letting new faces "get started now, and we'll sort out their gear tomorrow." Clause 3.5 exists precisely for them, and they never fail to appear in the accident statistics.
Pitfall 3: Skipping the no-load step in the trial run. You save one minute and bet the entire drive train on it.
What You Can Do Today
1. Pin four prep sheets to the whiteboard: People, Machines, Hot Work, Equipment, each with a named person responsible.
2. Finalise the day-one roster today and equip every new face individually.
3. Set up the "restart log" for critical equipment and assign each trial run to a named person.
4. Submit the hot work plan for the first week back to the safety department now, and have it reviewed under escalated management.
The four prep sheets really come down to one sentence: get the things you would be rushing to do on the first day back done during the holiday instead. What day does your plant restart? Tell us in the comments, and let's see whose prep sheets go up on the wall first.
This article is compiled from current laws, regulations and national standards. In case of discrepancy, the original text of the standards and your own organisation's rules prevail.